# How do heavy vehicles and uphill gradients affect highway capacity?

In a 100 km/h example with four lanes in each direction, the HBS design capacity falls from 7,200 to **6,400 vehicles per hour** as the heavy vehicle share rises from 10% to 30%. The manual also assigns lower capacities to steeper sustained climbs.[^1]

[HTML version](https://onemorelane.org/en/faq/heavy-vehicles-gradients-highway-capacity/)

![A lorry travelling on a tree-lined stretch of motorway.](https://onemorelane.org/photos/truck-960.webp)

Illustrative photo · [Arlind Photography / Unsplash](https://unsplash.com/photos/h-K2_KbtyLY)

## More heavy vehicles on the same road

This comparison keeps four regular lanes per direction, a location outside a metropolitan area, the speed category that includes 100 km/h, and a gradient of up to 2%. The table varies just the heavy vehicle share. The difference between 7,200 and 6,400 is 800 vehicles per hour in one direction, about eleven percent of the first figure. Another gradient or lane count takes its own row.[^1]

HBS 2015 · Four lanes on a gradient of up to 2%[^1]

| Heavy vehicle share | Veh/h per direction |
| --- | ---: |
| ≤ 5% | 7,400 |
| 10% | 7,200 |
| 20% | 6,800 |
| 30% | 6,400 |

## Steeper segments at the same heavy vehicle share

For four lanes outside a metropolitan area and 10% heavy vehicles, design capacity falls by **900 vehicles per hour per direction** between a 3% and a 5% grade. The separate HBS table for climbs of at least 500 m uses no speed-limit categories.[^1][^2]

HBS 2015 · Four lanes with 10% heavy vehicles on a sustained climb[^1]

| Uphill grade | Veh/h per direction |
| --- | ---: |
| 3% | 6,900 |
| 4% | 6,600 |
| ≤ 5% | 6,000 |

## Test it in the simulator

Start with 40% trucks and compare throughput with a stream of mostly cars.

- [Start with 40% trucks](https://onemorelane.org/en/highway/?map=highway&preset=custom&seed=1187&lanes=3&exitLanes=2&speed=100&attention=80&demand=160&style=balanced&extended=0&truckShare=0.4)

## Related questions

- [How many vehicles can pass a one-lane highway work zone at 80 km/h?](https://onemorelane.org/en/faq/one-lane-highway-work-zone-80-kmh/index.md)
- [How many vehicles per hour can a two-, three- or four-lane highway carry?](https://onemorelane.org/en/faq/hourly-highway-capacity-by-lane-count/index.md)
- [How many vehicles pass through one highway lane at 60, 80, 100 or 120 km/h?](https://onemorelane.org/en/faq/one-highway-lane-throughput-at-60-80-100-120/index.md)

## Sources

[^1]: [Geistefeldt and Hohmann (2024) · BASt V 377, Tables 2-6 and 2-7, pp. 48-49 (German)](https://edocs.tib.eu/files/e01fn25/1916864554.pdf)
[^2]: [Geistefeldt (2016) · Design capacity for sustained climbs, Section 2.2, Table 2, p. 421](https://doi.org/10.1016/j.trpro.2016.06.035)
